Fix concretelogging cable tube and electric post
- Concretelogged post no longer replaced by encased tube upon drying
This commit is contained in:
@@ -74,7 +74,7 @@ public class CableTubeBlock extends RotatedPillarBlock implements IBE<CableTubeB
|
|||||||
tickDrying(level, state, TFMGBlocks.CONCRETE_ENCASED_CABLE_TUBE.getDefaultState().setValue(AXIS, state.getValue(AXIS)), pos, randomSource);
|
tickDrying(level, state, TFMGBlocks.CONCRETE_ENCASED_CABLE_TUBE.getDefaultState().setValue(AXIS, state.getValue(AXIS)), pos, randomSource);
|
||||||
|
|
||||||
if (state.is(TFMGBlocks.ELECTRIC_POST.get()))
|
if (state.is(TFMGBlocks.ELECTRIC_POST.get()))
|
||||||
tickDrying(level, state, TFMGBlocks.CONCRETE_ENCASED_CABLE_TUBE.getDefaultState().setValue(AXIS, state.getValue(AXIS)), pos, randomSource);
|
tickDrying(level, state, TFMGBlocks.CONCRETE_ENCASED_ELECTRIC_POST.getDefaultState().setValue(AXIS, state.getValue(AXIS)), pos, randomSource);
|
||||||
}
|
}
|
||||||
|
|
||||||
|
|
||||||
|
|||||||
Reference in New Issue
Block a user